WIND OF CHANGE

WIND OF CHANGE

About the project

As a result of the agreement signed beyween Louis Dreyfus Armateurs S.A.S and Cemre Shipyard, the construction process of WIND OF CHANGE has started. We as Su Ship Design carried out all the advanced detail designs of WIND OF CHANGE, where basic design is designed by Salt Ship Design..

 

One of the most important features of the Wind of Change vessel is, it is one of the largest Service Operation Ships (SOV) in the Wind Turbine market, has ability of staff to transfer to the wind turbines safely even in heavy sea conditions thanks to the compensated bridge bridges with dynamic positioning system. After the main and detail design of the ship, the preparation of the necessary documents, installation of the necessary equipments, ventilation, cabling, pipe systems and isolation will are carried out within the scope of advanced detail design activities.

 

 





Features

SHIPYARD: CEMRE SHIPYARD
OWNER: LOUIS DREYFUS ARMATEURS S.A.S
BASIC DESIGN: SALT SHIP DESIGN
DETAIL DESIGN: SALT SHIP DESIGN
ADVANCED DETAIL DESIGN: SU SHIP DESIGN
CLASS: BV
FLAG: FRENCH FLAG
LENGTH OVERALL: 83,00m
BREADTH MOULDED: 19,40m
DRAUGHT: 5,00m
SPEED: 12,50 knots
ACCOMMODATION: 90 persons
DP CLASS: DP2
GANGWAY: AMOTION COMPENSATED GANGWAY (ABT 19m RANGE) UPTIME
Image Title
WIND OF CHANGE